The wind turbines at Arcadis Ost 1 are now fully erected

The successful completion of the second phase, marks the installation of the last three wind turbines at the Arcardis Ost 1 wind farm.

Read more

Demobilization of the Traverse System on WIND ORCA

We had a team of specialist in the Netherlands to carry out the demobilization of the Traverse System on Cadeler’s WIND ORCA.

Read more

HARCO Heavy Lifting on board the Thialf for the Arcadis Ost 1 wind farm project

HARCO Heavy Lifting on board the Thialf for the Arcadis Ost 1 wind farm project

Read more

HARCO HEAVY LIFTING replaces two gearboxes

We recently completed a Main Compnents Exchange project at Dantysk and Sandbank offshore wind farms

Read more

HARCO HEAVY LIFTING provides tagline system for launching the moonfish trenching vehicle

Jan De Nul has chosen HARCO Heavy Lifting for delivering a DP tagline system for launching their new intertidal trenching vehicle named “Moonfish”.

Read more

HARCO HEAVY LIFTING awarded major contract with SSE for DoggerBank support

SSE has granted HARCO Heavy Lifting a major 5-year contract including management and delivery of mock-up, LEAN optimization, site management, design of installation tools & technical support for foundation and WTG installation for the DoggerBank project.

Read more

HARCO Heavy Lifting will deliver tagline winches for the Arcadis Ost 1 Project

HARCO Heavy Lifting has been awarded the contract for delivering tagline winches for the Arcadis Ost project, as well as a “black box” for simulating HARCO winches in Heerema’s crane simulator.

Read more

Cadeler chooses HARCO Heavy Lifting as supplier of new traverse system for WIND ORCA

The order consists of production and delivery of a complete HARCO Dynamic Traverse System with a capacity of 7.5mT tagline force, compliant with all known 10MW+ WTGs. The system is designed for generic boom interfaces and features intuitive operator HMI and an innovative software package.

Read more

Vattenfall awards HARCO Heavy Lifting main component exchange contract in UK

Vattenfall has granted HARCO Heavy Lifting the Main Component Exchange contract for all Vattenfall’s offshore wind farms in United Kingdom from 2022-2025

Read more

Vattenfall awards HARCO Heavy Lifting Service Agreement

Vattenfall has granted HARCO Heavy Lifting the service contract for Lillgrund Offshore Windfarm from 2021-2023 + 2 years.

Read more

Fully automated tagline system on Heerema DOT FOX Project

HARCO Heavy Lifting delivered a fully automated tagline system for the Heerema DOT FOX project.

Read more

4 Gearboxes exchanged at Horns Rev 1

4 Gearboxes exchanged successfully on Vestas V80 Turbines.

Read more

Exchange of Gearboxes at Ormonde Wind farm

4X gearbox exchange at Ormonde Windfarm – 5MW Senvion Turbines.

Read more

Oil exchange 2021 - Lillgrund

Hydraulic oil exchange on all 48 turbines at Lillgrund Windfarm – 2,3 MW SGRE Turbines.

Read more

Gearbox and generator Exchange - DanTysk

Gearbox and generator exchanged at a record-breaking time of 3 days – 3,6 MW SGRE Turbines.

Read more

Service 2020 - Lillgrund

13-year service performed on all 48 turbines at Lillgrund Windfarm in Sweden – 2,3 MW SGRE Turbines.

Read more