• Tlf : +45 4070 9760
  • info@harco.dk
  • Opening hours: 7.00 – 16.00
  • Services
  • Products
    • Tagline systems
      • Dynamic Traverse System (DTS)
      • Dynamic Position Tagline System (DP)
      • Rental units
      • Independent Tagline System (Maverick)
    • Lifting Yokes
      • Hybrid MCE Lifting Kit
  • References
  • News
  • About Us
    • About
    • Meet our team
    • HSEQ
  • Career
  • Contact
  • Services
  • Products
    • Tagline systems
      • Dynamic Traverse System (DTS)
      • Dynamic Position Tagline System (DP)
      • Rental units
      • Independent Tagline System (Maverick)
    • Lifting Yokes
      • Hybrid MCE Lifting Kit
  • References
  • News
  • About Us
    • About
    • Meet our team
    • HSEQ
  • Career
  • Contact

  • HOME
  • Exchange of Gearboxes at Ormonde Wind farm

Exchange of Gearboxes at Ormonde Wind farm

HARCO Heavy Lifting exchanged 4 gearboxes at Ormonde Wind farm during March/April 2021. The exchange was completed successfully in collaboration with site crew.

COVID-19 restrictions during early 2021 complicated the project and added a few extra days, however the gearboxes were exchanged fast, safe and in high quality.

“Harco exchanged two gearboxes fast and safely at Ormonde Wind Farm. The exchange of the two gearboxes was done in 2 days, despite COVID-19 restrictions”

He continues:
“It is pleasant to work with Harco – they are fast and flexible, while performing turn-key solutions with high focus on safety and quality”
Main Component Exchange Supervisor, Claus Pedersen from Vattenfall
About the Wind Farm
The Ormonde Wind Farm is situated in the Irish Sea, 10 kilometres off Barrow-In-Furness. The wind farm was fully commissioned in early 2012, and consists of 30 5 MW Senvion turbines. The wind farm covers an area of 8,7 km2, and have a total capacity of 150 MW. (source: powerplants.vattenfall.com)

About HARCO Heavy Lifting
HARCO Heavy Liftings goal is to revolutionize the lifting industry with better and smarter applications, prepared for the future. The criteria of success are to provide advisory and knowhow to develop sustainable, cost efficient and cutting-edge solutions for the industry.
HARCO Heavy Lifting offers wind farm all-in services, main component exchanges, specialist services, equipment specialist services, and development and maintenance of equipment.
“As always, Harco have been utmost helpful during the project – they are extremely flexible which enables optimization of our operations”
Main Component Team Lead, Rene Henriksen from Vattenfall
Contact information:
Harco Heavy Lifting
Henrik Harkes
+45 40 70 97 62
hh@harco.dk

Other References

HARCO HEAVY LIFTING replaces two gearboxes
HARCO HEAVY LIFTING provides tagline system for launching the moonfish trenching vehicle
HARCO HEAVY LIFTING awarded major contract with SSE for DoggerBank support
HARCO Heavy Lifting will deliver tagline winches for the Arcadis Ost 1 Project
Cadeler chooses HARCO Heavy Lifting as supplier of new traverse system for WIND ORCA
Vattenfall awards HARCO Heavy Lifting main component exchange contract in UK
Vattenfall awards HARCO Heavy Lifting Service Agreement
Fully automated tagline system on Heerema DOT FOX Project
4 Gearboxes exchanged at Horns Rev 1
Optimizing offshore WTG operations has become our main criteria of success, which we achieve by utilizing our many years of experience to optimize operation processes and equipment.
  • info@harco.dk
  • +45 4070 9760
  • Måde Industrivej 32, 6705 Esbjerg Ø, Denmark

Follow us:


ISO

HARCO Heavy Lifting are certified according to ISO9001:2015, ISO14001:2015 and ISO45001:2022 by DNV-GL

Copyrights 2022. All Rights are Reserved by HARCO
  • Services
  • Products
  • References
  • News
  • About Us
  • Career
  • Contact