• Tlf : +45 4070 9760
  • info@harco.dk
  • Opening hours: 7.00 – 16.00
  • Services
  • Products
    • Tagline systems
      • Dynamic Traverse System (DTS)
      • Dynamic Position Tagline System (DP)
      • Rental units
      • Independent Tagline System (Maverick)
    • Lifting Yokes
      • Hybrid MCE Lifting Kit
  • References
  • News
  • About Us
    • About
    • Meet our team
    • HSEQ
  • Career
  • Contact
  • Services
  • Products
    • Tagline systems
      • Dynamic Traverse System (DTS)
      • Dynamic Position Tagline System (DP)
      • Rental units
      • Independent Tagline System (Maverick)
    • Lifting Yokes
      • Hybrid MCE Lifting Kit
  • References
  • News
  • About Us
    • About
    • Meet our team
    • HSEQ
  • Career
  • Contact

  • HOME
  • Vattenfall awards HARCO Heavy Lifting Service Agreement

Vattenfall awards HARCO Heavy Lifting Service Agreement

Vattenfall has granted HARCO Heavy Lifting the service contract for Lillgrund Offshore Windfarm from 2021-2023 + 2 years.

After a successful cooperation between Vattenfall and HARCO Heavy Lifting during the 2020 service agreement, Vattenfall has awarded HARCO the service agreement for the next 3-5 years at Sweden’s largest offshore wind farm.

The scope of work is annual services, oil exchange, up-tower repair, main component exchanges and troubleshooting.
Vattenfall comments:
The O&M Manager Tommy Aakesson at Lillgrund states:
“During the service campaign 2020 HARCO Heavy Lifting proved their vast flexibility and strong technical and administrative competences as a Turn-key supplier.
HARCO supported us in increasing availability, due to their fast, safe, and efficient execution, and thorough reporting.
We are now executing the 2021 service campaign, where HARCO already has serviced 32 of our 48 turbines.
During both the 2020 and 2021 campaign, we really appreciate the way that HARCO shows interest in us as client and site.
HARCO is always available on the phone, and they actively provide suggestions for optimization, as well as they manage to execute impressively fast.
We receive HSEQ and non-conformance reports on a daily basis, which gives us the opportunity to correct any given non-compliance as fast as possible.
HARCOs presence has really optimized our efficiency in all aspects ”


HARCO comments:
Henrik Harkes, HARCO Heavy Lifting CEO states:
“We are proud and humbled for being awarded this extended contract with Vattenfall. We have done our best in performing high safety, quality, and efficiency during our company startup, and we consider this contract an endorsement of our efforts.”
About Vattenfall
Vattenfall is one of the largest energy manufacturers in Europe and has supplied energy to private households for more than 100 years. Vattenfall’s goal is to make it possible to live fossil-free within one generation. They operate a portfolio of more than 1200 turbines, with a total installed capacity of approximately 3.6 GW across five countries.

About HARCO Heavy Lifting
HARCO Heavy Liftings goal is to revolutionize the lifting industry with better and smarter applications, prepared for the future. The criteria of success is to provide advisory and know-how to develop sustainable, cost-efficient, and cutting edge solutions for the industry. HARCO Heavy Lifting offers wind farm all-in services, main component exchange, specialist services, equipment specialist services, and development and maintenance of equipment.

For additional information:
HARCO Heavy Lifting
Henrik Harkes
+45 40 70 97 62
hh@harco.dk

Other References

HARCO HEAVY LIFTING replaces two gearboxes
HARCO HEAVY LIFTING provides tagline system for launching the moonfish trenching vehicle
HARCO HEAVY LIFTING awarded major contract with SSE for DoggerBank support
HARCO Heavy Lifting will deliver tagline winches for the Arcadis Ost 1 Project
Cadeler chooses HARCO Heavy Lifting as supplier of new traverse system for WIND ORCA
Vattenfall awards HARCO Heavy Lifting main component exchange contract in UK
Fully automated tagline system on Heerema DOT FOX Project
4 Gearboxes exchanged at Horns Rev 1
Exchange of Gearboxes at Ormonde Wind farm
The wind farm consists of 48 Siemens turbines with a capacity of 2,3 MW each.
The wind farm was commissioned in December 2007 and have a capacity of 110 MWe.
Optimizing offshore WTG operations has become our main criteria of success, which we achieve by utilizing our many years of experience to optimize operation processes and equipment.
  • info@harco.dk
  • +45 4070 9760
  • Måde Industrivej 32, 6705 Esbjerg Ø, Denmark

Follow us:


ISO

HARCO Heavy Lifting are certified according to ISO9001:2015, ISO14001:2015 and ISO45001:2022 by DNV-GL

Copyrights 2022. All Rights are Reserved by HARCO
  • Services
  • Products
  • References
  • News
  • About Us
  • Career
  • Contact