• Tlf : +45 4070 9760
  • info@harco.dk
  • Opening hours: 7.00 – 16.00
  • Services
  • Products
    • Tagline systems
      • Dynamic Traverse System (DTS)
      • Dynamic Position Tagline System (DP)
      • RENTAL – 4.5mT Dynamic Position Tagline System (DP)
      • Independent Tagline System (Maverick)
    • Lifting Yokes
      • Hybrid MCE Lifting Kit
  • References
  • News
  • About Us
    • About
    • Meet our team
    • ISO
  • Career
  • Contact
  • Services
  • Products
    • Tagline systems
      • Dynamic Traverse System (DTS)
      • Dynamic Position Tagline System (DP)
      • RENTAL – 4.5mT Dynamic Position Tagline System (DP)
      • Independent Tagline System (Maverick)
    • Lifting Yokes
      • Hybrid MCE Lifting Kit
  • References
  • News
  • About Us
    • About
    • Meet our team
    • ISO
  • Career
  • Contact

  • HOME
  • Vattenfall awards HARCO Heavy Lifting main component exchange contract in UK

Vattenfall awards HARCO Heavy Lifting main component exchange contract in UK

Vattenfall has granted HARCO Heavy Lifting the Main Component Exchange contract for all Vattenfall’s offshore wind farms in United Kingdom from 2022-2025.

HARCO Heavy Lifting started to exchange main components in cooperation with Vattenfall’s MCE team in 2020, and has been exchanging gearboxes, generators, and main shafts on Vattenfall’s wind farms in UK, Germany, Sweden, and Denmark. Based on the efficient ongoing cooperation, HARCO has been awarded the UK main component exchange contract for the next 3 years.

The scope of work is exchange of gearboxes, generators, main shafts, and blades. Furthermore, HARCO will supply hand tools, special tools, and hydraulic tools for all component exchanges.

The negotiation started at the beginning of September 2021, and the final contract was signed in December 2021. Resource planning has started, and the on-site work is expected to start end of January 2022.
Vattenfall comments:
"We have been working with HARCO Heavy Lifting on Main Component Exchanges for approx. 2 years and see HARCO as a highly professional supplier of specialized manpower.
Closing this contract with HARCO ensures Vattenfall a committed and highly competent supplier of specialized services, and we look forward to valuable cooperation for the next 3 + years."

Says MCE Supervisor Claus Pedersen from Vattenfall Wind Power’s specialized main component exchange department.

His colleague MCE Supervisor Karl Jørgensen continues:
“We look forward to starting our main component exchange cooperation with HARCO Heavy Lifting on our wind farms in UK. Our experiences with HARCO have shown us their flexibility and efficiency, which enables optimization of our offshore operations. This includes lowering of the overall cost, by reducing Jack-up charter rates and simultaneously increasing turbine availability”

HARCO comments:
“We are utmost pleased with the increased collaboration with Vattenfall. With this contract, we emphasize our focus on being absolute frontrunners in optimizing offshore MCE assignments. Ensuring optimum synergies for both us and Vattenfall, HARCO is currently in the process of establishing a HARCO entity in the UK.
This will take 4-6 months to implement, but we believe that this will enable us in supporting our customers even better than today.”

Says Henrik Harkes, HARCO Heavy Lifting CEO.
About HARCO Heavy Lifting
HARCO Heavy Liftings goal is to revolutionize the lifting industry with better and smarter applications, prepared for the future. The criteria of success is to provide advisory and know-how to develop sustainable, cost-efficient, and cutting edge solutions for the industry. HARCO Heavy Lifting offers wind farm all-in services, main component exchange, specialist services, equipment specialist services, and development and maintenance of equipment.

About Vattenfall
Vattenfall is one of the largest energy manufacturers in Europe and has supplied energy to private households for more than 100 years. Vattenfall’s goal is to make it possible to live fossil-free within one generation. They operate a portfolio of more than 1200 turbines, with a total installed capacity of approximately 3.6 GW across five countries.

For more information:
HARCO Heavy Lifting
Henrik Harkes
+45 40 70 97 62
hh@harco.dk

Other References

Cadeler chooses HARCO Heavy Lifting as supplier of new traverse system for WIND ORCA
Vattenfall awards HARCO Heavy Lifting Service Agreement
Fully automated tagline system on Heerema DOT FOX Project
4 Gearboxes exchanged at Horns Rev 1
Exchange of Gearboxes at Ormonde Wind farm
Oil exchange 2021 - Lillgrund
Gearbox and generator Exchange - DanTysk
Service 2020 - Lillgrund
The contract includes 5 offshore wind farms in the UK including: Kentish Flats (V90-3MW), Kentish Flats Extension (V112-3,3MW), Thanet OWF (V90-3MW), Ormonde OWF (Senvion 5MW) & Aberdeen OWF (V164-8,8MW).

The farms consists of 186 turbines, and have a capacity of: 686,3 MWe
Optimizing offshore WTG operations has become our main criteria of success, which we achieve by utilizing our many years of experience to optimize operation processes and equipment.
  • info@harco.dk
  • +45 4070 9760
  • Høgevej 8, 6705 Esbjerg Ø, Denmark

Follow us:


ISO

HARCO Heavy Lifting are certified according to ISO9001:2015, ISO14001:2015 and ISO45001:2022 by DNV-GL