• Tlf : +45 4070 9760
  • info@harco.dk
  • Opening hours: 7.00 – 16.00
  • Services
  • Products
    • Tagline systems
      • Dynamic Traverse System (DTS)
      • Dynamic Position Tagline System (DP)
      • Rental units
      • Independent Tagline System (Maverick)
    • Lifting Yokes
      • Hybrid MCE Lifting Kit
  • References
  • News
  • About Us
    • About
    • Meet our team
    • HSEQ
  • Career
  • Contact
  • Services
  • Products
    • Tagline systems
      • Dynamic Traverse System (DTS)
      • Dynamic Position Tagline System (DP)
      • Rental units
      • Independent Tagline System (Maverick)
    • Lifting Yokes
      • Hybrid MCE Lifting Kit
  • References
  • News
  • About Us
    • About
    • Meet our team
    • HSEQ
  • Career
  • Contact

  • HOME
  • Service 2020 - Lillgrund

Service 2020 - Lillgrund

HARCO Heavy Lifting performed the annual service on all 48 turbines at Lillgrund Offshore Windfarm during the summer 2020 despite challenges and restrictions during the COVID-19 pandemic.

The 2020 service was performed within the expected timeline, which have satisfied all parties involved.

All observations made throughout the project, has been submitted directly from our Service Technicians through the HARCO service app, enabling repair work during the planned service.

By reducing downtime during service, HARCO Heavy Lifting is contributing to the green transition, which is a huge focus in running our business. Henrik Harkes, Sales Director at HARCO Heavy Lifting, says: “We do our best to keep ensure optimum turbine availability, not only reducing customer cost, but also to make a long-term difference for the environment. We use our vast experience within the wind-industry, to optimize all aspects of turbine maintenance and operations. Through careful planning, thorough communication and safe and efficient execution, we manage to lower turbine downtime during all kinds of tasks. The cooperation with Lillgrund Offshore Windfarm during service 2020 has been a success. We are great full for the collaboration with Vattenfall Lillgrund – they are extremely professional and open to new ideas, which is a perfect match for us, illustrating new initiatives enabling optimization of turbine availability.“

“Harco Heavy Lifting is always paying attention and have a great understanding for their individual customer’s needs. With HARCO Heavy Lifting’s focus on safety, quality, flexibility and their ability to adapt to our needs, 2020 has been a successful year for us! Throughout this year, HARCO Heavy Lifting and their skilled technicians have been a great help to us in servicing and maintaining our 48 wind turbines at Lillgrund”
The O&M Manager Tommy Åkesson at Lillgrund
About the Wind Farm
The Wind Farm consists of 48 2,3 MW SGRE turbines. The Wind Farm was commissioned in December 2007, as the third-largest wind farm in the world. The wind turbines are 115-metres high and are visible on the horizon from the coast. (source: powerplants.vattenfall.com)

About HARCO Heavy Lifting
HARCO Heavy Liftings goal is to revolutionize the lifting industry with better and smarter applications, prepared for the future. The criteria of success are to provide advisory and knowhow to develop sustainable, cost efficient and cutting-edge solutions for the industry.
HARCO Heavy Lifting offers wind farm all-in services, main component exchanges, specialist services, equipment specialist services, and development and maintenance of equipment.

Other References

HARCO Heavy Lifting on board the Thialf for the Arcadis Ost 1 wind farm project
HARCO HEAVY LIFTING replaces two gearboxes
HARCO HEAVY LIFTING provides tagline system for launching the moonfish trenching vehicle
HARCO HEAVY LIFTING awarded major contract with SSE for DoggerBank support
HARCO Heavy Lifting will deliver tagline winches for the Arcadis Ost 1 Project
Cadeler chooses HARCO Heavy Lifting as supplier of new traverse system for WIND ORCA
Vattenfall awards HARCO Heavy Lifting main component exchange contract in UK
Vattenfall awards HARCO Heavy Lifting Service Agreement
Fully automated tagline system on Heerema DOT FOX Project
4 Gearboxes exchanged at Horns Rev 1
Optimizing offshore WTG operations has become our main criteria of success, which we achieve by utilizing our many years of experience to optimize operation processes and equipment.
  • info@harco.dk
  • +45 4070 9760
  • Måde Industrivej 32, 6705 Esbjerg Ø, Denmark

Follow us:


ISO

HARCO Heavy Lifting are certified according to ISO9001:2015, ISO14001:2015 and ISO45001:2022 by DNV-GL

Copyrights 2022. All Rights are Reserved by HARCO
  • Services
  • Products
  • References
  • News
  • About Us
  • Career
  • Contact